|
![]() |
Display Rental Rate as
Space | Size | Term | Rental Rate | Space Use | Condition | Available |
1st Floor | 27,360 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request Upon Request Upon Request | Flex | Full Build-Out | Now |
Size |
27,360 SF |
Term |
Negotiable |
Rental Rate |
Upon Request Upon Request Upon Request Upon Request Upon Request Upon Request |
Space Use |
Flex |
Condition |
Full Build-Out |
Available |
Now |
Free-standing 27,360 SF fully-equipped and ready-to-populate data center in Dayton, Ohio available for occupancy in January 2025 Equipment and infrastructure included in excellent condition with numerous recent refreshes. Metro and Long-Haul Fiber Connectivity on site. Power supplied by AES Ohio - 3 MW of infrastructure in place with expansion capacity to 5 MW in 6 months and scalable to 15 MW+ pending ramp request and timeline.